Very excited to see the kitchen and bathroom cabinets delivered on Friday 18th July and then installed the next day. Lucky we visit the house just about every day lol!
I took lots of photos through the (very dirty) sliding doors so some aren't the best quality.

Then on Monday 21st July I had a walk through with the SS to confirm the correct tiles had been delivered and to see how the rest of the progress was.

Overall I was very impressed with everything. The painter was there to get a headstart on the painting and the tiling was to start later in the week. The tiles delivered were the ones we ordered and the kitchen looked fabulous! It was amazing how much bigger the kitchen looked with the cabinetry installed!!

Lots of photos below:
kitchen cupboards delivered


                                                        kitchen cupboards installed (the next day)
 master bedroom Lin 1 doors
                                                                                                       ensuite cupboards delivered
 daughter's bedroom                       
                                                   other daughter's bedroom
spare room (toy room/study)

 ensuite
main bathroom
doors to alfresco
 shelf in front entry
 loving the facade
 and looove the front door
 garage door (love this too!)
garden room (lots of beautiful winter sun in here)

Saturday 5 July 2014

Gyprock and Water Tank

The last two weeks has seen the gyprock get delivered and put up, the water tank delivered and bricks cleaned.


Garage


Water tank



 Garden room


 View of dining room

 Front entry niche

 Master

Bricks have been cleaned